Railway Maintenance

Several ST chain hoists are used in England for the maintenance and replacement of railway lines. All the chain hoists are equipped with off-standard load pick-up equipment. The chain hoists are centrally controlled to ensure that they operate in synch. They are disconnected by gear limit switches which reliably limit the hoisting process

Localisation
England

Year
2010

Customer
Railway

Value
> 1 M EUR


Back to projects